Harvard Fabrication Installation - spring 2009
Ξ June 27th, 2009 | → 0 Comments | ∇ ArchiBlog |

This new installation in front of the GSD was shipped to the site and installed over two nights. Each piece is marked with a specific location and connection to each piece in proximity to it. 





































